SINGAPORE — FRIDAY, NOVEMBER 13, 2026 EDITION No.001
Data Centres & Cloud Regions
Tech

Data Centres & Cloud Regions

Tech · Jurong / Tuas / North-East

AddressJurong / Tuas / North-East
Hours7x24 operation, not open to the public
PriceRack colocation from S$1,200 a month; cloud usage-based
Rating4.2 / 5

Dense subsea cable landings, political stability and reliable power have drawn dozens of large data centres, and the island has long had the highest rack density in Southeast Asia. From 2022 the government tightened approvals, requiring higher energy efficiency (PUE) and favouring green power supply.

For a business, hosting in the Singapore region brings latency for Southeast Asian users down to tens of milliseconds. All three hyperscalers offer a Singapore region (ap-southeast-1 and similar), and multi-availability-zone deployment gives a decent disaster-recovery posture. Data residency requirements matter too - some regulated industries must keep data in country.

Colocation runs from about S$1,200 a month for a rack, more for a full cabinet with power and bandwidth; public cloud is usage-based, and a small project can start at tens of dollars a month. The usual trap is ignoring cross-region traffic and cold-storage retrieval, which only show up in month two. Put egress in the budget as a separate line.

Good to know

  • Multi-AZ is the baseline, but price the inter-zone traffic separately.
  • If your industry has residency rules, confirm the region is compliant first.
  • New build approvals are tight - self-built capacity takes longer than you think.

SEARCH THE ISLAND

Try: Maxwell · Tiong Bahru · laksa · Changi · condo